Progress Reports
Monthly Progress Reports
April 30, 2025
Progress Report #1
Cell Signaling site and utility work has been ongoing throughout the winter months. Progress being made with the installation of on-site drainage, water lines and underground structures following the new perimeter road on the south side of the project. The geothermal well
field consisting of 72 600’ deep wells and connecting piping has been completed drilling and has been fully backfilled.. Drilling and blasting of rock ledge on-site is complete. Rock stabilization work, where rock was vertically removed within the building footprint is 50% complete, with completion of this scope anticipated for the end of May. . On-site rock crushing and processing is ongoing and will be complete in early May. Water and sewer lines connected to existing services at 128 have been extended through the MAC property to the new loop road. The underground water, drainage, and sewer lines will continue to be installed over the next couple of months. As these utilities are installed, rough grades are established for roadways and buildings.